Project

OUR COMPLETED PROJECTS

Excavation, Civil and Cable Laying Works

☛ Motorway (M2) Long-haul Lahore Ravi Toll to Sukheki Toll Plaza excavation, Hand holes, Laying Fiber Optic Cable approximately 93km Project by One Network (FWO)
☛ Motorway (M4) Long-haul Faisalabad to Multan Motorway excavation, Hand holes, Laying Fiber Optic Cable approximately 103km (FWO)
Hazara Motorway (M-1 to E35) Long-haul Burhan Toll to Manserah II Toll Plaza excavation, Hand holes, Laying Fiber Optic Cable approximately 115km (FWO / One Network) (2023)
Hazara Motorway (E35) Manserah Toll Plaza to Thacot Existing Buried Network Repairing, Hand holes, Laying Fiber Optic Cable approximately 69km (FWO / One Network) (2023)
☛ PTCL / Wateen Pvt. Ltd. A Project Telenor Pakistan Towers Connectivity on Buried Fiber Cable at different Tower Sites in Lahore City approximately 47km as Sub. Contractor of M/s Jumlish Int. Pvt. Ltd.
☛ PTCL / Wateen Pvt. Ltd. A Project Telenor Pakistan Towers Connectivity on Buried Fiber Cable at Warsak Road to Khazana Sugar Mill to University Road Peshawar approximately 53km as Sub. Contractor of M/s Jumlish Int. Pvt. Ltd.
☛ 800 Lines PTCL GPON Project Completed at Johar Town Lahore. (2020)
☛ Cybernet (Strom Fiber) Civil Work with Cable Laying and Complete Solution at Shakhupra approximately 65km work done. (2022)
☛ 450 Lines PTCL GPON Project Completed at Allama Iqbal Town Lahore. (2022)

☛ Connectivity with cabins and placement of Handhole and Renovation of 24 Numbers of Cabins Structures. (FWO)
☛ Supply and Placing of Handhole in 327 Sites Safe city Project by (FWO) in Rawalpindi, Pakistan.
☛ Supply and Placing of Handhole in 255 Sites Safe city Project by (FWO) in Faisalabad, Pakistan
☛ Supply and Placing of Handhole in 334Sites Safe city Project by (FWO) in Gujranwala, Pakistan
☛ Ring Road Lahore Raiwind Road Toll Plaza to Multan Road Toll Plaza Buried Connectivity Excavation Pipe Laying, Cable Puling, Handhole Placing, Road Cutting, HDD Boar etc. Project by One Network (FWO)
☛ 03 Years Contract Based maintained Buried Network Operation and Maintenance of LinkdotNet (JAZZ) in Lahore and Karach
☛ Motorway (M4) Samundari Toll Plaza Buried Network connectivity with cabins and placement of Handhole and Renovation of 8 Numbers of Cabins Structures. (One Network) FWO 2025
☛ Motorway (M4) Tobatek Singh Toll Plaza Buried Network connectivity with cabins and placement of Handhole and Renovation of 8 Numbers of Cabins Structures. (FWO) 2026
☛ Safe City Islamabad 600 Sites Power Condeuting and Fiber Connectivity with OLT,

Installations